Groundworks package for exclusive architecturally designed house
- Excavation and installation of groundsource pipework
- Landscaping and levels to a landscape design
- Installation of ACO drainage
- Resin bound installation to car turntable
- Formation of external concrete steps
- Muck away from site
- Deep drainage to 2-3 metres with installation of pipework
- Installation of electrical ducting and water pipe
- Installation of surface water and foul water pipework and manholes.
Related case studies
Miltons Bridge, Dulverton
Miltons Bridge deck was beyond repair Demolished existing deck Strengthen and concrete cap existing abutments Fabricate and install new steel deck structure Install precast concrete planks and c35 reinforced slab Build natural stone side walls and castle stone capping
Sheraton Business Centre, Perivale, London
Groundworks for a new build industrial park of 11 no. buildings. Works include: Site remediation including breaking out of existing concrete and crushing on site; Foundations for two storey steel frame storage building including tie beams and reinforced concrete ring beam; Concrete floor to a power float finish; Trenching and installation of all services and utilities… Read more »
Huf Haus, Ross-on-Wye
Demolition and Groundworks package for a Huf Haus new build – Principal Contractor Demolition of existing bungalow including safe handling and disposal of asbestos Setting out of site Excavation of site and backfill with compacted Type 1 – CBR tested Installation of surface water and foul drainage Installation of ducting and air source heat pump… Read more »
Anchorwood, Barnstaple, North Devon
Deep drainage, foul and storm drainage and directional drilling for a major housing development and retail park. Works include: Installation of 500mm storm outfall pipe using trenchless technology to install under the Tarka Trail, including diamond core drilling through 3m thick concrete estuary wall; Installation of 600mm foul pipework at 6m deep to include manholes and… Read more »
Cheale Farm, Essex
Major infrastructure project to commercial farm Works included: UTX directional drilling of 125 mm gas main under Network Rail line and industrial compound together with connection to the national gas main; Directional drilling under main road; Lay 125mm gas main to include electro fusion joints and pressure testing; Supply and installation of temporary concrete base and short term… Read more »





