Case Study Bury, Dulverton

Installation of treatment plant at Bury Village

  •  Road crossing by directional drill
  •  Installation of foul water pipe and Marsh treatment plant

Related case studies

The River Yealm Hotel, Newton Ferrers, South Devon

Groundworks package for a residential development scheme comprising the refurbishment of an existing riverfront Hotel and luxury new build apartments and houses.  Works included: Demolition of extensions and internal soft strip out of Hotel; Identification and licenced disposal of Asbestos containing materials; Installation of all new services and utilities including connections into mains services within adjacent… Read more »

Natsley Farm, Brayford

Cut and Fill marsh valley area below Natsley Farm house to create a large pond, Lined with Sodium Bentonite geotextile membrane Outfall pipe 300mm twin wall pipe

Mapperton House, Dorset

Groundworks for a renewable energy project at a historic Grade I listed house and 5 estate properties together with the construction of a new access road. Works included: Groundworks and preparation of site for Biomass boiler and woodchip storage building together with auger woodchip delivery system;   Trenching and directional drilling for installation of Rehau insulated pipework and ducting;… Read more »

Dunheved Road, Launceston

Retaining wall stabilisation with use of platypus anchors Excavate 35m trench

Wedgewood Groundworks logo

Anchorwood, Barnstaple, North Devon

Deep drainage, foul and storm drainage and directional drilling for a major housing development and retail park. Works include: Installation of 500mm storm outfall pipe using trenchless technology to install under the Tarka Trail, including diamond core drilling through 3m thick concrete estuary wall; Installation of 600mm foul pipework at 6m deep to include manholes and… Read more »