Case Study Cotswold Casements, Moreton-in-Marsh

Groundworks for an extension to an existing industrial building.

Works include:

  • Excavation of site, footings and foundation pits for steel framed building;
  • Concrete pour to foundation pits and stone wall footings;
  • Construction of stone wall;
  • Installation of 150mm thick  slab to power float finish;
  • Find and extend existing services.