Groundworks for an extension to an existing industrial building.

Works include:

  • Excavation of site, footings and foundation pits for steel framed building;
  • Concrete pour to foundation pits and stone wall footings;
  • Construction of stone wall;
  • Installation of 150mm thick  slab to power float finish;
  • Find and extend existing services.

 


Related case studies

Tuffley Farm, Gloucestershire

Initial site setup and investigation package for residential housing scheme; Demolition of existing agricultural buildings, including Asbestos disposal; Construction of site compound; Site strip, map and record of 7 ha site – archaelogical planning requirement.

Huf Haus, Ross-on-Wye

Huf Haus, Ross-on-Wye

Demolition and Groundworks package for a Huf Haus new build – Principal Contractor Demolition of existing bungalow including safe handling and disposal of asbestos Setting out of site Excavation of site and backfill with compacted Type 1 – CBR tested Installation of surface water and foul drainage Installation of ducting and air source heat pump… Read more »

University of Bath

Deep drainage installation for Bath University Trench excavation to 8m Installation of trench boxes with 30ton excavator Installation of drainage pipes at depths of between 6-8 m (450mm and 600mm pipes) Installation of manholes and soakaways

Natsley Farm, Brayford

Cut and Fill marsh valley area below Natsley Farm house to create a large pond, Lined with Sodium Bentonite geotextile membrane Outfall pipe 300mm twin wall pipe

Wedgewood Groundworks logo

Anchorwood, Barnstaple, North Devon

Deep drainage, foul and storm drainage and directional drilling for a major housing development and retail park. Works include: Installation of 500mm storm outfall pipe using trenchless technology to install under the Tarka Trail, including diamond core drilling through 3m thick concrete estuary wall; Installation of 600mm foul pipework at 6m deep to include manholes and… Read more »