- Retaining wall stabilisation with use of platypus anchors
- Excavate 35m trench
Related case studies
Mole Bridge, South Molton
The original bridge was hit with extensive flood damage. Demolition of original bridge and rebuild keeping the traditional features.
Mapperton House, Dorset
Groundworks for a renewable energy project at a historic Grade I listed house and 5 estate properties together with the construction of a new access road. Works included: Groundworks and preparation of site for Biomass boiler and woodchip storage building together with auger woodchip delivery system; Trenching and directional drilling for installation of Rehau insulated pipework and ducting;… Read more »
Villa Nurseries, Roydon
Groundworks for an existing business installing a biomass system Works include: Excavation of site and installation of 150mm compacted sub base; Supply and lay circa. 900 sqm of 150mm reinforced concrete slab to power float and textured finish; Installation of services inc. attenuation tank, manholes, Aco drainage and inspection chambers.
Cheale Farm, Essex
Major infrastructure project to commercial farm Works included: UTX directional drilling of 125 mm gas main under Network Rail line and industrial compound together with connection to the national gas main; Directional drilling under main road; Lay 125mm gas main to include electro fusion joints and pressure testing; Supply and installation of temporary concrete base and short term… Read more »
Goring Gap Boat Club
Groundwork package for new Boat Club building Works include: Demolition of existing WWII Shelter Excavate site to 300mm and spreading / bunding of material Formation of hard core working area Foundations for steel portal frame building (1.8m by 1.8m) and casting of holding down bolts Installation of surface water drainage Installation of 150mm compacted floor… Read more »