Deep drainage, foul and storm drainage and directional drilling for a major housing development and retail park.

Works include:

  • Installation of 500mm storm outfall pipe using trenchless technology to install under the Tarka Trail, including diamond core drilling through 3m thick concrete estuary wall;
  • Installation of 600mm foul pipework at 6m deep to include manholes and inspection chambers, working with trench boxes and over pumping;
  • Installation of 450mm storm drainage at 2m deep to include manholes and inspection chambers.

 

 


Completed Ongoing

Related case studies

Mapperton House, Dorset

Groundworks for a renewable energy project at a historic Grade I listed house and 5 estate properties together with the construction of a new access road. Works included: Groundworks and preparation of site for Biomass boiler and woodchip storage building together with auger woodchip delivery system;   Trenching and directional drilling for installation of Rehau insulated pipework and ducting;… Read more »

Quince Honey Farm, South Molton

Principal contractor for the groundworks and buildings at the New Quince Honey Farm Groundworks package for 5 new commercial buildings including foundation and slab design Design and installation of 2 new bellmouth access’s Installation of new roads and paths Installation of surface water and foul water systems inc. attenuation ponds, hydrobrakes and commercial treatment plant

The River Yealm Hotel, Newton Ferrers, South Devon

Groundworks package for a residential development scheme comprising the refurbishment of an existing riverfront Hotel and luxury new build apartments and houses.  Works included: Demolition of extensions and internal soft strip out of Hotel; Identification and licenced disposal of Asbestos containing materials; Installation of all new services and utilities including connections into mains services within adjacent… Read more »

Goring Gap Boat Club

Groundwork package for new Boat Club building Works include:  Demolition of existing WWII Shelter  Excavate site to 300mm and spreading / bunding of material Formation of hard core working area Foundations for steel portal frame building (1.8m by 1.8m) and casting of holding down bolts Installation of surface water drainage  Installation of 150mm compacted floor… Read more »

Broadlys, Saunton

Groundworks package for exclusive architecturally designed house Excavation and installation of groundsource pipework Landscaping and levels to a landscape design Installation of ACO drainage Resin bound installation to car turntable Formation of external concrete steps Muck away from site Deep drainage to 2-3 metres with installation of pipework Installation of electrical ducting and water pipe… Read more »