Groundworks for a renewable energy project at a historic Grade I listed house and 5 estate properties together with the construction of a new access road.
Works included:
- Groundworks and preparation of site for Biomass boiler and woodchip storage building together with auger woodchip delivery system;
- Trenching and directional drilling for installation of Rehau insulated pipework and ducting;
- New access road for the estate including installation of bodpave for the coach park and a grass-protecta system for the overflow carpark;
- Tortoise enclosure;
- Landscaping of Old Rectory gardens to landscape architect specification.
Related case studies
Miltons Bridge, Dulverton
Miltons Bridge deck was beyond repair Demolished existing deck Strengthen and concrete cap existing abutments Fabricate and install new steel deck structure Install precast concrete planks and c35 reinforced slab Build natural stone side walls and castle stone capping
Villa Nurseries, Roydon
Groundworks for an existing business installing a biomass system Works include: Excavation of site and installation of 150mm compacted sub base; Supply and lay circa. 900 sqm of 150mm reinforced concrete slab to power float and textured finish; Installation of services inc. attenuation tank, manholes, Aco drainage and inspection chambers.
Mole Bridge, South Molton
The original bridge was hit with extensive flood damage. Demolition of original bridge and rebuild keeping the traditional features.
Pengelly Estate, Penzance
A project in conjunction with Biogest SW involving the installation of an Anaerobic Digester. Works included: Concrete storage pits construction including installation of pre-cast concrete panels; Installation of 315mm and 450mm HDPE gas pipe by way of electro fusion and butt fusion welding. Carried out pressure testing of the system; Concrete slabs to both power float and… Read more »
University of Bath
Deep drainage installation for Bath University Trench excavation to 8m Installation of trench boxes with 30ton excavator Installation of drainage pipes at depths of between 6-8 m (450mm and 600mm pipes) Installation of manholes and soakaways