Case Study The River Yealm Hotel, Newton Ferrers, South Devon

Groundworks package for a residential development scheme comprising the refurbishment of an existing riverfront Hotel and luxury new build apartments and houses. 

Works included:

  • Demolition of extensions and internal soft strip out of Hotel;
  • Identification and licenced disposal of Asbestos containing materials;
  • Installation of all new services and utilities including connections into mains services within adjacent road;
  • Slope re-profiling, installation of rock netting, rock pinning and soil nailing for slope stabilisation;
  • Construction of gabion cage/basket retaining walls;
  • Installation of Tensar green slope geotextile stabilisation system to provide a car deck;
  • Landscaping of site.

 


Related case studies

Miltons Bridge, Dulverton

Miltons Bridge deck was beyond repair Demolished existing deck Strengthen and concrete cap existing abutments Fabricate and install new steel deck structure Install precast concrete planks and c35 reinforced slab Build natural stone side walls and castle stone capping  

Tuffley Farm, Gloucestershire

Initial site setup and investigation package for residential housing scheme; Demolition of existing agricultural buildings, including Asbestos disposal; Construction of site compound; Site strip, map and record of 7 ha site – archaelogical planning requirement.

Natsley Farm, Brayford

Cut and Fill marsh valley area below Natsley Farm house to create a large pond, Lined with Sodium Bentonite geotextile membrane Outfall pipe 300mm twin wall pipe

Wedgewood Groundworks logo

Anchorwood, Barnstaple, North Devon

Deep drainage, foul and storm drainage and directional drilling for a major housing development and retail park. Works include: Installation of 500mm storm outfall pipe using trenchless technology to install under the Tarka Trail, including diamond core drilling through 3m thick concrete estuary wall; Installation of 600mm foul pipework at 6m deep to include manholes and… Read more »

Dunheved Road, Launceston

Retaining wall stabilisation with use of platypus anchors Excavate 35m trench