Major infrastructure project to commercial farm
Works included:
- UTX directional drilling of 125 mm gas main under Network Rail line and industrial compound together with connection to the national gas main;
- Directional drilling under main road;
- Lay 125mm gas main to include electro fusion joints and pressure testing;
- Supply and installation of temporary concrete base and short term gas supply (Flogas) before main gas change over;
- Construction of hard core access track.
Related case studies
Miltons Bridge, Dulverton
Miltons Bridge deck was beyond repair Demolished existing deck Strengthen and concrete cap existing abutments Fabricate and install new steel deck structure Install precast concrete planks and c35 reinforced slab Build natural stone side walls and castle stone capping
Sheraton Business Centre, Perivale, London
Groundworks for a new build industrial park of 11 no. buildings. Works include: Site remediation including breaking out of existing concrete and crushing on site; Foundations for two storey steel frame storage building including tie beams and reinforced concrete ring beam; Concrete floor to a power float finish; Trenching and installation of all services and utilities… Read more »
Tuffley Farm, Gloucestershire
Initial site setup and investigation package for residential housing scheme; Demolition of existing agricultural buildings, including Asbestos disposal; Construction of site compound; Site strip, map and record of 7 ha site – archaelogical planning requirement.
Longstone Wells, Heasley Mill
Groundworks and demolition for residential conversion project Installation of new stone track Demolition of existing stone barns with safe disposal of ACM’s Preparation and installation of concrete floor slabs Installation of surface water and foul drainage systems Landscaping and creation of a pond
Broadlys, Saunton
Groundworks package for exclusive architecturally designed house Excavation and installation of groundsource pipework Landscaping and levels to a landscape design Installation of ACO drainage Resin bound installation to car turntable Formation of external concrete steps Muck away from site Deep drainage to 2-3 metres with installation of pipework Installation of electrical ducting and water pipe… Read more »