Full groundworks package including design and build of a 36m by 78m wine processing plant building and a 30m by 78m wine storage building.

Works include:

  • Diversion of existing services and utilities;
  • Bulk excavations and cut and fill to include layering and compacting of chalk;
  • Construction of reinforced retaining walls (140 linear metres);
  • Installation of new services and utilities including aqua storm ply cells and directional drilling for storm outfall pipes;
  • Preparation for large reinforced concrete slabs with k form shuttering and reinforcing mesh;
  • Supply and lay of approx. 5,000 sqm of 150mm reinforced concrete slabs to a power float finish;
  • Supply and install internal drainage alongside food grade resin flooring;
  • Landscaping chalk bund areas with topsoil and seed;
  • Liaising with principal contractor and providing design solutions.

Completed Ongoing

Related case studies

Villa Nurseries, Roydon

Groundworks for an existing business installing a biomass system Works include: Excavation of site and installation of 150mm compacted sub base; Supply and lay circa. 900 sqm of 150mm reinforced concrete slab to power float and textured finish; Installation of services inc. attenuation tank, manholes, Aco drainage and inspection chambers.

Broadlys, Saunton

Groundworks package for exclusive architecturally designed house Excavation and installation of groundsource pipework Landscaping and levels to a landscape design Installation of ACO drainage Resin bound installation to car turntable Formation of external concrete steps Muck away from site Deep drainage to 2-3 metres with installation of pipework Installation of electrical ducting and water pipe… Read more »

Sheraton Business Centre, Perivale, London

Groundworks for a new build industrial park of 11 no. buildings. Works include: Site remediation including breaking out of existing concrete and crushing on site; Foundations for two storey steel frame storage building including tie beams and reinforced concrete ring beam; Concrete floor to a power float finish; Trenching and installation of all services and utilities… Read more »

Mole Bridge, South Molton

The original bridge was hit with extensive flood damage. Demolition of original bridge and rebuild keeping the traditional features.  

The River Yealm Hotel, Newton Ferrers, South Devon

Groundworks package for a residential development scheme comprising the refurbishment of an existing riverfront Hotel and luxury new build apartments and houses.  Works included: Demolition of extensions and internal soft strip out of Hotel; Identification and licenced disposal of Asbestos containing materials; Installation of all new services and utilities including connections into mains services within adjacent… Read more »