Case Study Goring Gap Boat Club

Groundwork package for new Boat Club building

Works include: 

  • Demolition of existing WWII Shelter 
  • Excavate site to 300mm and spreading / bunding of material
  • Formation of hard core working area
  • Foundations for steel portal frame building (1.8m by 1.8m) and casting of holding down bolts
  • Installation of surface water drainage 
  • Installation of 150mm compacted floor slab (6F2)