Case Study Longstone Wells, Heasley Mill

Groundworks and demolition for residential conversion project

  • Installation of new stone track
  • Demolition of existing stone barns with safe disposal of ACM’s
  • Preparation and installation of concrete floor slabs
  • Installation of surface water and foul drainage systems
  • Landscaping and creation of a pond 

Related case studies

Cheale Farm, Essex

Major infrastructure project to commercial farm Works included: UTX directional drilling of 125 mm gas main under Network Rail line and industrial compound together with connection to the national gas main; Directional drilling under main road; Lay 125mm gas main to include electro fusion joints and pressure testing; Supply and installation of temporary concrete base and short term… Read more »

Quince Honey Farm, South Molton

Principal contractor for the groundworks and buildings at the New Quince Honey Farm Groundworks package for 5 new commercial buildings including foundation and slab design Design and installation of 2 new bellmouth access’s Installation of new roads and paths Installation of surface water and foul water systems inc. attenuation ponds, hydrobrakes and commercial treatment plant

Mapperton House, Dorset

Groundworks for a renewable energy project at a historic Grade I listed house and 5 estate properties together with the construction of a new access road. Works included: Groundworks and preparation of site for Biomass boiler and woodchip storage building together with auger woodchip delivery system;   Trenching and directional drilling for installation of Rehau insulated pipework and ducting;… Read more »

Wedgewood Groundworks logo

Rathfinny Wine Estate, Polegate, East Sussex

Full groundworks package including design and build of a 36m by 78m wine processing plant building and a 30m by 78m wine storage building. Works include: Diversion of existing services and utilities; Bulk excavations and cut and fill to include layering and compacting of chalk; Construction of reinforced retaining walls (140 linear metres); Installation of new… Read more »

Portledge Estate, Bideford

Major refurbishment project of Manor House and estate buildings. Works included: Hard and soft landscaping of extensive gardens and grounds; Trenching and installation of new services and utilities to the Manor House and estate buildings; Construction of access roads and stone paving; Installation of steel frame structure for swimming pool.