Case Study Lynch House, Kingsclere, Newbury

Demolition of existing house in Kingsclere Newbury, groundworks contract on rebuild of new dwelling, garaging and pool house.

Works included:

  • Demolition of building including making safe utility supplies;
  • Crushing of concrete on site;
  • Safe identification and disposal of asbestos;
  • Excavations for reduced dig and cart away;
  • Trenching and installation of utilities and ducting;
  • Concrete footings and slabs;
  • Block and beam flooring;
  • Reinforced concrete retaining walls;
  • Foul and storm drainage to soak-aways;
  • Driveways and soft-landscaping.

 

 


Related case studies

The Horses Trust, Speen

Groundworks package for large scale extension to Trust buildings Cut and fill program for new manege / tractor storage building Design and installation of new floor slabs and aprons Installation of new road / track Installation of surface water and foul water systems inc. attenuation and treatment plant Directional drilling of over 200m of electrical… Read more »

University of Bath

Deep drainage installation for Bath University Trench excavation to 8m Installation of trench boxes with 30ton excavator Installation of drainage pipes at depths of between 6-8 m (450mm and 600mm pipes) Installation of manholes and soakaways

Dunheved Road, Launceston

Retaining wall stabilisation with use of platypus anchors Excavate 35m trench

Bury, Dulverton

Installation of treatment plant at Bury Village  Road crossing by directional drill  Installation of foul water pipe and Marsh treatment plant

Portledge Estate, Bideford

Major refurbishment project of Manor House and estate buildings. Works included: Hard and soft landscaping of extensive gardens and grounds; Trenching and installation of new services and utilities to the Manor House and estate buildings; Construction of access roads and stone paving; Installation of steel frame structure for swimming pool.