Case Study Miltons Bridge, Dulverton

Miltons Bridge deck was beyond repair

  • Demolished existing deck
  • Strengthen and concrete cap existing abutments
  • Fabricate and install new steel deck structure
  • Install precast concrete planks and c35 reinforced slab
  • Build natural stone side walls and castle stone capping

 


Related case studies

Wedgewood Groundworks logo

Anchorwood, Barnstaple, North Devon

Deep drainage, foul and storm drainage and directional drilling for a major housing development and retail park. Works include: Installation of 500mm storm outfall pipe using trenchless technology to install under the Tarka Trail, including diamond core drilling through 3m thick concrete estuary wall; Installation of 600mm foul pipework at 6m deep to include manholes and… Read more »

Cheale Farm, Essex

Major infrastructure project to commercial farm Works included: UTX directional drilling of 125 mm gas main under Network Rail line and industrial compound together with connection to the national gas main; Directional drilling under main road; Lay 125mm gas main to include electro fusion joints and pressure testing; Supply and installation of temporary concrete base and short term… Read more »

Lynch House, Kingsclere, Newbury

Demolition of existing house in Kingsclere Newbury, groundworks contract on rebuild of new dwelling, garaging and pool house. Works included: Demolition of building including making safe utility supplies; Crushing of concrete on site; Safe identification and disposal of asbestos; Excavations for reduced dig and cart away; Trenching and installation of utilities and ducting; Concrete footings… Read more »

Villa Nurseries, Roydon

Groundworks for an existing business installing a biomass system Works include: Excavation of site and installation of 150mm compacted sub base; Supply and lay circa. 900 sqm of 150mm reinforced concrete slab to power float and textured finish; Installation of services inc. attenuation tank, manholes, Aco drainage and inspection chambers.

Huf Haus, Ross-on-Wye

Huf Haus, Ross-on-Wye

Demolition and Groundworks package for a Huf Haus new build – Principal Contractor Demolition of existing bungalow including safe handling and disposal of asbestos Setting out of site Excavation of site and backfill with compacted Type 1 – CBR tested Installation of surface water and foul drainage Installation of ducting and air source heat pump… Read more »