The original bridge was hit with extensive flood damage.
Demolition of original bridge and rebuild keeping the traditional features.
Related case studies
Natsley Farm, Brayford
Cut and Fill marsh valley area below Natsley Farm house to create a large pond, Lined with Sodium Bentonite geotextile membrane Outfall pipe 300mm twin wall pipe
Portledge Estate, Bideford
Major refurbishment project of Manor House and estate buildings. Works included: Hard and soft landscaping of extensive gardens and grounds; Trenching and installation of new services and utilities to the Manor House and estate buildings; Construction of access roads and stone paving; Installation of steel frame structure for swimming pool.
Dunheved Road, Launceston
Retaining wall stabilisation with use of platypus anchors Excavate 35m trench
Lynch House, Kingsclere, Newbury
Demolition of existing house in Kingsclere Newbury, groundworks contract on rebuild of new dwelling, garaging and pool house. Works included: Demolition of building including making safe utility supplies; Crushing of concrete on site; Safe identification and disposal of asbestos; Excavations for reduced dig and cart away; Trenching and installation of utilities and ducting; Concrete footings… Read more »
Goring Gap Boat Club
Groundwork package for new Boat Club building Works include: Demolition of existing WWII Shelter Excavate site to 300mm and spreading / bunding of material Formation of hard core working area Foundations for steel portal frame building (1.8m by 1.8m) and casting of holding down bolts Installation of surface water drainage Installation of 150mm compacted floor… Read more »








