Case Study Natsley Farm, Brayford

Cut and Fill marsh valley area below Natsley Farm house to create a large pond,

Lined with Sodium Bentonite geotextile membrane

Outfall pipe 300mm twin wall pipe


Related case studies

Portledge Estate, Bideford

Major refurbishment project of Manor House and estate buildings. Works included: Hard and soft landscaping of extensive gardens and grounds; Trenching and installation of new services and utilities to the Manor House and estate buildings; Construction of access roads and stone paving; Installation of steel frame structure for swimming pool.

University of Bath

Deep drainage installation for Bath University Trench excavation to 8m Installation of trench boxes with 30ton excavator Installation of drainage pipes at depths of between 6-8 m (450mm and 600mm pipes) Installation of manholes and soakaways

Huf Haus, Ross-on-Wye

Huf Haus, Ross-on-Wye

Demolition and Groundworks package for a Huf Haus new build – Principal Contractor Demolition of existing bungalow including safe handling and disposal of asbestos Setting out of site Excavation of site and backfill with compacted Type 1 – CBR tested Installation of surface water and foul drainage Installation of ducting and air source heat pump… Read more »

Miltons Bridge, Dulverton

Miltons Bridge deck was beyond repair Demolished existing deck Strengthen and concrete cap existing abutments Fabricate and install new steel deck structure Install precast concrete planks and c35 reinforced slab Build natural stone side walls and castle stone capping  

Wedgewood Groundworks logo

Rathfinny Wine Estate, Polegate, East Sussex

Full groundworks package including design and build of a 36m by 78m wine processing plant building and a 30m by 78m wine storage building. Works include: Diversion of existing services and utilities; Bulk excavations and cut and fill to include layering and compacting of chalk; Construction of reinforced retaining walls (140 linear metres); Installation of new… Read more »