Case Study Pengelly Estate, Penzance

A project in conjunction with Biogest SW involving the installation of an Anaerobic Digester.

Works included:

  • Concrete storage pits construction including installation of pre-cast concrete panels;
  • Installation of 315mm and 450mm HDPE gas pipe by way of electro fusion and butt fusion welding. Carried out pressure testing of the system;
  • Concrete slabs to both power float and brushed finish;
  • Directional drilling of 180mm HDPE digestate pipework for a total of 250m, including 2 river crossings and 3 road crossings;
  • Landscaping of main site.