Groundworks for a new build industrial park of 11 no. buildings.
Works include:
- Site remediation including breaking out of existing concrete and crushing on site;
- Foundations for two storey steel frame storage building including tie beams and reinforced concrete ring beam;
- Concrete floor to a power float finish;
- Trenching and installation of all services and utilities including applications, drawings and inspections.
Related case studies
University of Bath
Deep drainage installation for Bath University Trench excavation to 8m Installation of trench boxes with 30ton excavator Installation of drainage pipes at depths of between 6-8 m (450mm and 600mm pipes) Installation of manholes and soakaways
Mole Bridge, South Molton
The original bridge was hit with extensive flood damage. Demolition of original bridge and rebuild keeping the traditional features.
Longstone Wells, Heasley Mill
Groundworks and demolition for residential conversion project Installation of new stone track Demolition of existing stone barns with safe disposal of ACM’s Preparation and installation of concrete floor slabs Installation of surface water and foul drainage systems Landscaping and creation of a pond
Bury, Dulverton
Installation of treatment plant at Bury Village Road crossing by directional drill Installation of foul water pipe and Marsh treatment plant
Portledge Estate, Bideford
Major refurbishment project of Manor House and estate buildings. Works included: Hard and soft landscaping of extensive gardens and grounds; Trenching and installation of new services and utilities to the Manor House and estate buildings; Construction of access roads and stone paving; Installation of steel frame structure for swimming pool.