Case Study Quince Honey Farm, South Molton

Principal contractor for the groundworks and buildings at the New Quince Honey Farm

  • Groundworks package for 5 new commercial buildings including foundation and slab design
  • Design and installation of 2 new bellmouth access’s
  • Installation of new roads and paths
  • Installation of surface water and foul water systems inc. attenuation ponds, hydrobrakes and commercial treatment plant

Related case studies

Huf Haus, Ross-on-Wye

Huf Haus, Ross-on-Wye

Demolition and Groundworks package for a Huf Haus new build – Principal Contractor Demolition of existing bungalow including safe handling and disposal of asbestos Setting out of site Excavation of site and backfill with compacted Type 1 – CBR tested Installation of surface water and foul drainage Installation of ducting and air source heat pump… Read more »

The River Yealm Hotel, Newton Ferrers, South Devon

Groundworks package for a residential development scheme comprising the refurbishment of an existing riverfront Hotel and luxury new build apartments and houses.  Works included: Demolition of extensions and internal soft strip out of Hotel; Identification and licenced disposal of Asbestos containing materials; Installation of all new services and utilities including connections into mains services within adjacent… Read more »

Wedgewood Groundworks logo

Rathfinny Wine Estate, Polegate, East Sussex

Full groundworks package including design and build of a 36m by 78m wine processing plant building and a 30m by 78m wine storage building. Works include: Diversion of existing services and utilities; Bulk excavations and cut and fill to include layering and compacting of chalk; Construction of reinforced retaining walls (140 linear metres); Installation of new… Read more »

Mole Bridge, South Molton

The original bridge was hit with extensive flood damage. Demolition of original bridge and rebuild keeping the traditional features.  

Lynch House, Kingsclere, Newbury

Demolition of existing house in Kingsclere Newbury, groundworks contract on rebuild of new dwelling, garaging and pool house. Works included: Demolition of building including making safe utility supplies; Crushing of concrete on site; Safe identification and disposal of asbestos; Excavations for reduced dig and cart away; Trenching and installation of utilities and ducting; Concrete footings… Read more »