Initial site setup and investigation package for residential housing scheme;
- Demolition of existing agricultural buildings, including Asbestos disposal;
- Construction of site compound;
- Site strip, map and record of 7 ha site – archaelogical planning requirement.
Related case studies
Broadlys, Saunton
Groundworks package for exclusive architecturally designed house Excavation and installation of groundsource pipework Landscaping and levels to a landscape design Installation of ACO drainage Resin bound installation to car turntable Formation of external concrete steps Muck away from site Deep drainage to 2-3 metres with installation of pipework Installation of electrical ducting and water pipe… Read more »
Longstone Wells, Heasley Mill
Groundworks and demolition for residential conversion project Installation of new stone track Demolition of existing stone barns with safe disposal of ACM’s Preparation and installation of concrete floor slabs Installation of surface water and foul drainage systems Landscaping and creation of a pond
Huf Haus, Ross-on-Wye
Demolition and Groundworks package for a Huf Haus new build – Principal Contractor Demolition of existing bungalow including safe handling and disposal of asbestos Setting out of site Excavation of site and backfill with compacted Type 1 – CBR tested Installation of surface water and foul drainage Installation of ducting and air source heat pump… Read more »
Bury, Dulverton
Installation of treatment plant at Bury Village Road crossing by directional drill Installation of foul water pipe and Marsh treatment plant
Cheale Farm, Essex
Major infrastructure project to commercial farm Works included: UTX directional drilling of 125 mm gas main under Network Rail line and industrial compound together with connection to the national gas main; Directional drilling under main road; Lay 125mm gas main to include electro fusion joints and pressure testing; Supply and installation of temporary concrete base and short term… Read more »