Deep drainage installation for Bath University
- Trench excavation to 8m
- Installation of trench boxes with 30ton excavator
- Installation of drainage pipes at depths of between 6-8 m (450mm and 600mm pipes)
- Installation of manholes and soakaways
Related case studies
Huf Haus, Ross-on-Wye
Demolition and Groundworks package for a Huf Haus new build – Principal Contractor Demolition of existing bungalow including safe handling and disposal of asbestos Setting out of site Excavation of site and backfill with compacted Type 1 – CBR tested Installation of surface water and foul drainage Installation of ducting and air source heat pump… Read more »
Pengelly Estate, Penzance
A project in conjunction with Biogest SW involving the installation of an Anaerobic Digester. Works included: Concrete storage pits construction including installation of pre-cast concrete panels; Installation of 315mm and 450mm HDPE gas pipe by way of electro fusion and butt fusion welding. Carried out pressure testing of the system; Concrete slabs to both power float and… Read more »
The River Yealm Hotel, Newton Ferrers, South Devon
Groundworks package for a residential development scheme comprising the refurbishment of an existing riverfront Hotel and luxury new build apartments and houses. Works included: Demolition of extensions and internal soft strip out of Hotel; Identification and licenced disposal of Asbestos containing materials; Installation of all new services and utilities including connections into mains services within adjacent… Read more »
Mole Bridge, South Molton
The original bridge was hit with extensive flood damage. Demolition of original bridge and rebuild keeping the traditional features.
Dunheved Road, Launceston
Retaining wall stabilisation with use of platypus anchors Excavate 35m trench