Case Study University of Bath

Deep drainage installation for Bath University

  • Trench excavation to 8m
  • Installation of trench boxes with 30ton excavator
  • Installation of drainage pipes at depths of between 6-8 m (450mm and 600mm pipes)
  • Installation of manholes and soakaways

Related case studies

Bury, Dulverton

Installation of treatment plant at Bury Village  Road crossing by directional drill  Installation of foul water pipe and Marsh treatment plant

Broadlys, Saunton

Groundworks package for exclusive architecturally designed house Excavation and installation of groundsource pipework Landscaping and levels to a landscape design Installation of ACO drainage Resin bound installation to car turntable Formation of external concrete steps Muck away from site Deep drainage to 2-3 metres with installation of pipework Installation of electrical ducting and water pipe… Read more »

Natsley Farm, Brayford

Cut and Fill marsh valley area below Natsley Farm house to create a large pond, Lined with Sodium Bentonite geotextile membrane Outfall pipe 300mm twin wall pipe

Cotswold Casements, Moreton-in-Marsh

Groundworks for an extension to an existing industrial building. Works include: Excavation of site, footings and foundation pits for steel framed building; Concrete pour to foundation pits and stone wall footings; Construction of stone wall; Installation of 150mm thick  slab to power float finish; Find and extend existing services.  

Cheale Farm, Essex

Major infrastructure project to commercial farm Works included: UTX directional drilling of 125 mm gas main under Network Rail line and industrial compound together with connection to the national gas main; Directional drilling under main road; Lay 125mm gas main to include electro fusion joints and pressure testing; Supply and installation of temporary concrete base and short term… Read more »