Case Study Villa Nurseries, Roydon

Groundworks for an existing business installing a biomass system

Works include:

  • Excavation of site and installation of 150mm compacted sub base;
  • Supply and lay circa. 900 sqm of 150mm reinforced concrete slab to power float and textured finish;
  • Installation of services inc. attenuation tank, manholes, Aco drainage and inspection chambers.

Related case studies

Lynch House, Kingsclere, Newbury

Demolition of existing house in Kingsclere Newbury, groundworks contract on rebuild of new dwelling, garaging and pool house. Works included: Demolition of building including making safe utility supplies; Crushing of concrete on site; Safe identification and disposal of asbestos; Excavations for reduced dig and cart away; Trenching and installation of utilities and ducting; Concrete footings… Read more »

Sheraton Business Centre, Perivale, London

Groundworks for a new build industrial park of 11 no. buildings. Works include: Site remediation including breaking out of existing concrete and crushing on site; Foundations for two storey steel frame storage building including tie beams and reinforced concrete ring beam; Concrete floor to a power float finish; Trenching and installation of all services and utilities… Read more »

Mapperton House, Dorset

Groundworks for a renewable energy project at a historic Grade I listed house and 5 estate properties together with the construction of a new access road. Works included: Groundworks and preparation of site for Biomass boiler and woodchip storage building together with auger woodchip delivery system;   Trenching and directional drilling for installation of Rehau insulated pipework and ducting;… Read more »

The Horses Trust, Speen

Groundworks package for large scale extension to Trust buildings Cut and fill program for new manege / tractor storage building Design and installation of new floor slabs and aprons Installation of new road / track Installation of surface water and foul water systems inc. attenuation and treatment plant Directional drilling of over 200m of electrical… Read more »

Huf Haus, Ross-on-Wye

Huf Haus, Ross-on-Wye

Demolition and Groundworks package for a Huf Haus new build – Principal Contractor Demolition of existing bungalow including safe handling and disposal of asbestos Setting out of site Excavation of site and backfill with compacted Type 1 – CBR tested Installation of surface water and foul drainage Installation of ducting and air source heat pump… Read more »