Case Study Villa Nurseries, Roydon

Groundworks for an existing business installing a biomass system

Works include:

  • Excavation of site and installation of 150mm compacted sub base;
  • Supply and lay circa. 900 sqm of 150mm reinforced concrete slab to power float and textured finish;
  • Installation of services inc. attenuation tank, manholes, Aco drainage and inspection chambers.

Related case studies

Mapperton House, Dorset

Groundworks for a renewable energy project at a historic Grade I listed house and 5 estate properties together with the construction of a new access road. Works included: Groundworks and preparation of site for Biomass boiler and woodchip storage building together with auger woodchip delivery system;   Trenching and directional drilling for installation of Rehau insulated pipework and ducting;… Read more »

Mole Bridge, South Molton

The original bridge was hit with extensive flood damage. Demolition of original bridge and rebuild keeping the traditional features.  

The Horses Trust, Speen

Groundworks package for large scale extension to Trust buildings Cut and fill program for new manege / tractor storage building Design and installation of new floor slabs and aprons Installation of new road / track Installation of surface water and foul water systems inc. attenuation and treatment plant Directional drilling of over 200m of electrical… Read more »

Goring Gap Boat Club

Groundwork package for new Boat Club building Works include:  Demolition of existing WWII Shelter  Excavate site to 300mm and spreading / bunding of material Formation of hard core working area Foundations for steel portal frame building (1.8m by 1.8m) and casting of holding down bolts Installation of surface water drainage  Installation of 150mm compacted floor… Read more »

Cotswold Casements, Moreton-in-Marsh

Groundworks for an extension to an existing industrial building. Works include: Excavation of site, footings and foundation pits for steel framed building; Concrete pour to foundation pits and stone wall footings; Construction of stone wall; Installation of 150mm thick  slab to power float finish; Find and extend existing services.