Case Study: Completed
Anchorwood, Barnstaple, North Devon
Deep drainage, foul and storm drainage and directional drilling for a major housing development and retail park. Works include: Installation of 500mm storm outfall pipe using trenchless technology to install under the Tarka Trail, including diamond core drilling through 3m thick concrete estuary wall; Installation of 600mm foul pipework at 6m deep to include manholes and… Read more »
Mapperton House, Dorset
Groundworks for a renewable energy project at a historic Grade I listed house and 5 estate properties together with the construction of a new access road. Works included: Groundworks and preparation of site for Biomass boiler and woodchip storage building together with auger woodchip delivery system; Trenching and directional drilling for installation of Rehau insulated pipework and ducting;… Read more »
The River Yealm Hotel, Newton Ferrers, South Devon
Groundworks package for a residential development scheme comprising the refurbishment of an existing riverfront Hotel and luxury new build apartments and houses. Works included: Demolition of extensions and internal soft strip out of Hotel; Identification and licenced disposal of Asbestos containing materials; Installation of all new services and utilities including connections into mains services within adjacent… Read more »
Cheale Farm, Essex
Major infrastructure project to commercial farm Works included: UTX directional drilling of 125 mm gas main under Network Rail line and industrial compound together with connection to the national gas main; Directional drilling under main road; Lay 125mm gas main to include electro fusion joints and pressure testing; Supply and installation of temporary concrete base and short term… Read more »
Rathfinny Wine Estate, Polegate, East Sussex
Full groundworks package including design and build of a 36m by 78m wine processing plant building and a 30m by 78m wine storage building. Works include: Diversion of existing services and utilities; Bulk excavations and cut and fill to include layering and compacting of chalk; Construction of reinforced retaining walls (140 linear metres); Installation of new… Read more »
Portledge Estate, Bideford
Major refurbishment project of Manor House and estate buildings. Works included: Hard and soft landscaping of extensive gardens and grounds; Trenching and installation of new services and utilities to the Manor House and estate buildings; Construction of access roads and stone paving; Installation of steel frame structure for swimming pool.
Pengelly Estate, Penzance
A project in conjunction with Biogest SW involving the installation of an Anaerobic Digester. Works included: Concrete storage pits construction including installation of pre-cast concrete panels; Installation of 315mm and 450mm HDPE gas pipe by way of electro fusion and butt fusion welding. Carried out pressure testing of the system; Concrete slabs to both power float and… Read more »
Sheraton Business Centre, Perivale, London
Groundworks for a new build industrial park of 11 no. buildings. Works include: Site remediation including breaking out of existing concrete and crushing on site; Foundations for two storey steel frame storage building including tie beams and reinforced concrete ring beam; Concrete floor to a power float finish; Trenching and installation of all services and utilities… Read more »
Lynch House, Kingsclere, Newbury
Demolition of existing house in Kingsclere Newbury, groundworks contract on rebuild of new dwelling, garaging and pool house. Works included: Demolition of building including making safe utility supplies; Crushing of concrete on site; Safe identification and disposal of asbestos; Excavations for reduced dig and cart away; Trenching and installation of utilities and ducting; Concrete footings… Read more »
Cotswold Casements, Moreton-in-Marsh
Groundworks for an extension to an existing industrial building. Works include: Excavation of site, footings and foundation pits for steel framed building; Concrete pour to foundation pits and stone wall footings; Construction of stone wall; Installation of 150mm thick slab to power float finish; Find and extend existing services.